The People Who Make Connection Work

Who must participate for a project to succeed and continue?

A stakeholder model for digital inclusion: who they are, how to find them, what each contributes, and how the cast changes over a project's life. With stakeholder maps for the six use cases in Paul Ross's dissertation.

The People Who Make Connection Work book cover

Preface

Connection is a team effort nobody fully sees

Ask who a school connectivity project needs and most people name four: the school, the library, the internet provider, and families. They are right, and they are nowhere near finished.

Behind a hotspot program stand the district technology staff who configure and filter devices, the counselors who quietly identify students in need, the wireless carrier whose coverage decides whether the device works at home, and the school board that decides whether the data plans are paid for next year. Behind an apartment building upgrade stand the owner who controls the risers and rooftop, the maintenance staff who know where the old wiring runs, and the permitting office whose timeline sets the construction calendar.

Paul Ross's dissertation (committee draft, September 23, 2026) makes stakeholder and system context analysis the second phase of its ten-phase conceptual model. Interview participants praised the model for treating stakeholders as connected actors rather than a flat list, and asked it to go further: separate the people who receive services from the people who fund, approve, regulate, implement, design, and sustain them, and weigh their power honestly.

This book takes up that request in five parts:

  1. Why the usual suspects are not enough, with evidence from the 6,295-record project archive.
  2. A stakeholder model built from the dissertation's findings: four families and eleven roles.
  3. How to identify stakeholders, step by step.
  4. How the cast changes across a project's life cycle, and with the problem and the solution.
  5. Stakeholder maps for the dissertation's six appendix use cases, each with an interactive life-cycle explorer, plus a tool for building your own map.

About the sources. The dissertation file provided includes the table of contents for its appendices (W, X, and AC through AK) but not their body text. The use case maps therefore combine two kinds of entries, and every entry is labeled. Named stakeholders appear in the dissertation's Chapter 4 text or figure notes. Derived stakeholders are this book's application of the model, supported where possible by projects in the archive. If you share the full appendices, the maps can be checked against them.

Chapter 1

Beyond the usual suspects

No single organization controls everything a connection needs. Yet the public record of most projects names only one or two of the organizations involved.

The dissertation's interview participants were unanimous on the first point. They called for coordinated roles across federal, state, and local government, internet service providers, educational institutions, libraries, nonprofits, philanthropy, businesses, and communities. Federal evidence cited in the dissertation points the same way: the GAO (2022) found more than 100 federal programs across 15 agencies that could support broadband, marked by fragmentation, overlap, and coordination problems.

"I mean, they theoretically converge, but they're very divergent in terms of responsibilities."Interview participant QS2, on end users, providers, school networks, and libraries

What the archive's records name

The project archive records each project's lead and involved entities. Sorting those entries into stakeholder types shows how narrow the recorded cast usually is.

Government and providers dominate the recorded castShare of 6,295 archive records whose lead or involved entities include each stakeholder type.
Share of the 6,295 archive records whose "Lead / Involved Entities" field names each type. Types were assigned by keyword matching, so the figures are approximate; a record can count toward several types. Beneficiaries usually appear in a separate target-population field, which is part of the point.

Two further figures from the same field tell the story. The median record names entities from just one stakeholder type, and 59% name one type or none. Only 11% name three or more types. Residents, families, and students appear as participants in under 2% of records, even though they are the intended beneficiaries of nearly all of them.

That is not because projects lack partners. It is because the organizations that fund and lead a project are the ones that get written down. The school custodian, the property manager, the counselor, the church volunteer, the utility pole crew, and the teenager who helps a grandparent set up a patient portal rarely make the record, and they are often the reason a project works.

Three reasons the wider cast matters

  1. The affected are not the empowered. The dissertation notes that the parties affected by the divide are not always the parties with authority, funding, infrastructure, or implementation capacity. In its apartment use case, residents are the main beneficiaries but often the least formally powerful in deciding the design.
  2. Hidden gatekeepers stop projects. Whoever controls a rooftop, a riser, a pole, a data agreement, or a budget line can end a project that everyone else supports.
  3. Continuation depends on people who arrive late. Help desks, maintenance staff, navigators, and the funder of recurring costs matter most after launch, when planning teams have often disbanded.

Chapter 2

The stakeholder model

A useful stakeholder model sorts people by what they do for the project, not by what kind of organization they belong to. A librarian can be an implementer, a trusted helper, and a site host in the same week.

The dissertation's interviews supplied the vocabulary. Participants asked the model to distinguish recipients of services from those responsible for helping them, and to name beneficiaries, implementers, funders, providers, regulators, designers, navigators, evaluators, and decision makers. Participant QG added "responsible parties," especially those who design systems and so decide whether people can use them. This book groups those roles into four families.

People served

The people whose participation is the goal, and whose knowledge of their own barriers is evidence no one else has.

  • Beneficiaries: students, families, residents, patients, workers, older adults, small businesses.

People who decide and fund

The people who approve, pay for, and set the rules for the project.

  • Decision makers: boards, councils, superintendents, owners' leadership.
  • Funders: agencies, philanthropy, lenders, ministries.
  • Regulators: permitting offices, commissions, privacy and eligibility rule-setters.

People who build and operate

The people who control the physical and technical means, and the people who put them to work.

  • Asset holders: owners of buildings, poles, rooftops, conduit, sites, and data.
  • Providers: internet, wireless, satellite, device, and platform suppliers.
  • Implementers: IT staff, contractors, teachers, program staff, maintenance crews.
  • Designers: the people who shape interfaces, curricula, and services, and so decide who can use them.

People who connect and sustain

The people who turn access into use, and who find out whether it worked.

  • Trusted helpers: digital navigators, librarians, community and faith organizations, peer mentors, student ambassadors.
  • Evaluators: data teams, researchers, help desks whose tickets reveal hidden barriers.

The education families

For education projects, the dissertation's Appendix X, Education Specific Stakeholders, organizes the field into major stakeholder families. Its outline names them: governance, strategy, and leadership; teaching, curriculum, and learning design; technology, networks, and digital operations; accessibility, language access, and specialized support; student services, family, and community connection; funding, procurement, and program implementation; research, data, and accountability; career, technical, STEM, and workforce pathways; and higher education and campus digital equity. Every one of those families maps onto one or more of the four families above, and every one is more than a single "school" stakeholder.

Levels, not a flat list

The dissertation places digital exclusion across individual, community, institutional, and policy domains, drawing on Helsper (2012) and the World Bank (2016). Stakeholders sit at each level, and influence travels between them: a state broadband office's rules shape a provider's offer, which shapes a family's bill.

Stakeholders act at four levels, and influence crosses them Four nested bands: policy, institutional, community, individual. Each band lists example stakeholders. Arrows show influence moving inward from policy to individuals and evidence moving outward. Stakeholders act at four levels, and influence crosses them PolicyInstitutionalCommunityIndividual and household legislators, broadband offices, regulators, federal and state funders districts, colleges, housing authorities, providers, owners, health systems libraries, nonprofits, faith groups, employers, local champions students, parents and caregivers, residents, older adults, workers, patients, small businesses rules and money flow in needs and evidence flow out
Levels after the dissertation's use of Helsper (2012) and the World Bank (2016). Example stakeholders are drawn from the dissertation's use cases and interviews.

One person, several roles

The dissertation's rural use case makes the point directly: in small communities roles overlap. A superintendent may also be a civic leader. A public librarian can be a digital navigator. County administrators may oversee grant applications but not the infrastructure. A good map records roles, not just names, so that one overloaded person is visible as a single point of failure.

Chapter 3

How to identify stakeholders

Stakeholder identification is a search, not a guest list. The dissertation's Phase 2, Stakeholder and System Context Analysis, sets out its steps.

The detailed model outline (Appendix AC) names six steps for Phase 2. They run in order, because each depends on the one before it:

  1. Identify stakeholder categories

    Start broad: every family and level in Chapter 2. Ask which categories this problem touches.

  2. Define individual roles and decision authority

    Move from organizations to named roles. Who signs, who approves, who can say no?

  3. Assess influence, power, interest, and impact

    Weigh each stakeholder's authority against how much the outcome affects them. The rural use case adds trust and implementation capacity.

  4. Establish engagement pathways

    Decide how each stakeholder will take part: governance seat, advisory group, survey, focus group, help-desk feedback, multilingual outreach.

  5. Identify connected individuals and entities

    Follow each stakeholder's own relationships: the contractor the owner uses, the church the families trust, the carrier the district already pays.

  6. Validate evidence and assumptions

    Check the map with the people on it, especially those with the least formal power, and record what is still assumed.

Six searches that surface the missing people

The steps say what to do. These searches, drawn from the dissertation's use cases and interview advice, say where to look.

SearchThe question to askWho it tends to find
Follow the barrierWhich barrier categories did the diagnosis find, and who controls each one?Providers for availability; benefit administrators and enrollment helpers for affordability; refurbishers and IT staff for devices; navigators and colleges for skills; community groups for trust
Follow the assetsWhat physical or digital assets must be used, and who owns them?Property owners, pole and tower owners, utilities, rooftop and site hosts, data holders
Follow the moneyWho pays now, who pays in year two, and whose rules come with the money?Funders, boards, budget offices, lenders, grant compliance staff
Follow the user's journeyWhat does a family touch from first hearing about the program to using it a year later?Outreach workers, counselors, sign-up staff, installers, help desks, teachers who assign the work
Follow the rulesWhich permits, eligibility rules, privacy terms, and policies apply?Permitting offices, regulators, privacy officers, school boards, housing agencies
Ask the communityWho do residents trust, and what do they say their pain points are?Local champions, faith and cultural groups, tenant leaders, peer mentors
"And then you've got to show them, ask them what their pain points are."Interview participant QM

Participant QR1 added a practical warning: ZIP codes can hide pockets of need, and census-block data from providers allows more targeted engagement. Participant QJ2 recommended cross-sector gap and SWOT analysis across government, industry, nonprofits, and education. Both widen the search beyond the people already at the table.

Weighing power honestly

The dissertation calls this power weighting. Its apartment use case shows why: the owner and management control risers, rooftops, budgets, and schedules; providers and contractors decide technical options; residents live with the result. The model uses the imbalance to make sure the people with the most at stake are heard in design, not only informed after it.

In an apartment upgrade, those with most at stake hold least authority A two-by-two chart. Horizontal axis: how much the outcome affects them. Vertical axis: formal authority over the project. Residents sit at high stake, low authority. Property owner and funders sit high on authority. Community organizations and navigators sit at moderate stake and low authority. Permitting sits at moderate authority and low stake. In an apartment upgrade, those with most at stake hold least authority Illustrative placements based on the dissertation's multiple dwelling unit use case How much the outcome affects them Formal authority over the project Decide, lightly affectedDecide and affected Consult as neededMost at stake, least say Property owner Funders Internet provider Management company Permitting office Maintenance staff Community organizations Tenant leaders Residents
Stakeholders in the lower right need a formal voice: a governance seat, resident review of design options, and feedback channels that reach decision makers. Tenant leaders are a derived addition.

Chapter 4

A cast that changes across the life cycle

The people a project needs at the start are not the people it needs at launch, and neither group is the one that keeps it running.

The dissertation's apartment use case (Appendix AF) lays out seven implementation phases, which this book uses as a common life cycle for all six use cases: initiate, assess and engage, design and procure, pilot and validate, build and deploy, activate and adopt, and operate and review. Deciders and funders dominate the first stages. Builders take over in the middle. Trusted helpers, help desks, and evaluators carry the end, which is also where continuation is won or lost.

Who leads shifts from deciders to builders to helpersStacked bars for seven life-cycle stages showing how many stakeholders from each family lead or actively contribute, across the six use case maps in this book.
Stakeholders who lead or actively contribute at each stage, counted across the six use case maps in Chapters 5 to 10. Coded by this book from the maps; consulted-only roles are not counted.

What each stage asks of stakeholders

StageWhat happensWho usually carries itWho is easily forgotten
InitiateFrame the problem, the population, and the causal explanationDecision makers, funders, project leadThe people affected, whose account of the barrier tests the causal story
Assess and engageBaseline, needs assessment, stakeholder mapping, site and market reviewProject team, community organizations, data holdersMaintenance staff and site owners, who know the physical constraints
Design and procureCompare options, pass the decision gate, contractProviders, IT staff, procurement, regulatorsDesigners and accessibility specialists; residents reviewing options
Pilot and validateTest with real users in a small areaImplementers, early users, evaluatorsHelp-desk staff, who see the first failures
Build and deployConstruct, install, configure, distributeContractors, providers, IT staff, permittingResidents disrupted by construction; transport and facilities staff
Activate and adoptEnroll, onboard, train, supportNavigators, librarians, community groups, teachersPeer mentors and student ambassadors; caregivers
Operate and reviewMaintain, measure outcomes, adjust, renew fundingOperators, evaluators, funders of recurring costsWhoever pays in year two; the successor to departing staff

The problem and the solution decide the cast

The dissertation's core finding is that solutions must be matched to causes. The same logic applies to people: each barrier and each solution type brings its own stakeholders. An affordability problem needs whoever sets prices and whoever helps families enroll. A skills problem needs navigators and teachers, not contractors. Chapter 11's tool builds a starting roster from the barriers and solution you choose.

Who keeps it going

Interview participants treated sustainability as broad: recurring costs, training, support, equipment refresh, staffing, and continued funding. Each is a stakeholder question. Before launch, name the person or organization responsible for each, and check that they were at the table early enough to agree.

"So there are op-ex costs that need to be encouraged to maintain it."Interview participant QR1

Chapter 5 · Use case

An older apartment building gets connected

Appendix AF

A 100-unit building from the 1970s, where broadband is technically available but slow, unreliable, and costly. The upgrade is a digital inclusion project, not only a wiring job.

The dissertation names the key stakeholders directly: residents, property owners, the management company, maintenance staff, internet service providers, wiring contractors, local permitting authorities, housing agencies, community-based organizations, and any public or philanthropic funders. It singles out the power gap: owners and managers control risers, rooftops, utility rooms, conduit, budgets, and schedules; providers and contractors decide technical options; residents, the main beneficiaries, have the least formal say. Community organizations and digital navigators shape adoption through trusted communication, multilingual support, and enrollment help.

The appendix outline adds a recommended governance structure with resident participation, and a stakeholder table of project-specific roles (Tables AF1 and AF2).

Easily missed: maintenance staff, who know where the old pathways run; the community anchor whose nearby backhaul the dissertation lists as an enabler; and tenant leaders who can carry resident concerns about displacement, privacy, and distrust of management into governance.

Archive projects with this cast

  • California's CASF public housing portfolio brings together the California Public Utilities Commission, four affordable housing developments with 315 units, and providers, with no-cost service for residents. DD-04866
  • Detroit's Last Mile Initiative joins the Rocket Community Fund, DigitalC, and the Detroit Housing Commission to reach up to 2,400 households. DD-05149
  • People's Choice Communications in the Bronx and Manhattan is worker- and community-owned: worker-owners and subscriber-members share governance, and it trains digital stewards. DD-04535

Who keeps it going

The owner or management company (upkeep of in-building equipment), the provider (service and the affordable tier), a named support path for residents, and whoever reviews adoption, speed, and affordability by unit type and language group. The dissertation's continuous improvement loop assigns that review to the owner, residents, provider, and community partners together.

Chapter 6 · Use case

A rural community of fewer than 10,000

Appendix AG

Here the divide is a community development problem. The school may be the digital hub; the library, clinic, and churches carry trust; the internet provider may be a cooperative, a satellite service, or no one at all.

The dissertation names an unusually wide cast: residents, students, parents, teachers, school leaders, town or county officials, tribal or regional governments where appropriate, public libraries, healthcare providers, workforce agencies, agricultural employers, chambers of commerce, nonprofits, broadband providers, state broadband offices, and funding agencies. Among enablers it lists a supportive district, an engaged library, a regional electric cooperative, a community foundation, and public buildings that can host equipment; among amplifiers, local businesses, telehealth demand, workforce partnerships, and a community college willing to teach digital literacy.

It asks that stakeholders be mapped by title, influence, trust, authority, and implementation capacity, and it warns that legitimacy is essential: a technically perfect solution can fail if residents feel it is imposed, expensive, unreliable, or disconnected from local needs. Local champions can speed adoption by framing the work in familiar settings and trusted language.

Easily missed: the electric cooperative, whose poles, rights-of-way, and member trust can decide the architecture; outlying households at the edge of town; and a named grant coordinator, since the dissertation lists weak public-sector capacity to manage grants as a root cause.

Archive projects with this cast

  • The Superior HIVE Rural Technology Center in Superior, Arizona involves the Institute for Digital Equity and Inclusion, the Superior Enterprise Center, Rebuild Superior, the Town of Superior, Resolution Copper, and residents. It offers free Wi-Fi, one-to-one help, classes, telemedicine rooms, and remote-work space. DD-04546
  • Microsoft Airband works with provider partners across fiber, fixed wireless, and satellite; the record reports U.S. partners received more than $725 million in government infrastructure awards, about 80% for rural communities. DD-04502

Who keeps it going

The dissertation's phased plan ends with institutionalizing sustainability through local policy, annual funding, asset lifecycle plans, support workflows, and partnerships with county, state, education, and private-sector entities. Each needs an owner: typically the town or county, the library, the provider, and a local champion group.

Chapter 7 · Use case

A community free wireless network

Appendix AH

A public network offering trusted, no-cost connectivity for education, employment, health care, public services, and civic participation.

The dissertation's figure note for this use case (Figure 50) frames it as a public-access digital inclusion intervention rather than a stand-alone Wi-Fi installation, and says success depends on network architecture combined with affordability, multilingual outreach, device access, digital navigation, privacy protections, cybersecurity, maintenance, public trust, and ongoing evaluation. Each of those implies stakeholders, and those are marked as named below.

In the committee draft, the Chapter 4 narrative for this use case repeats the stakeholder paragraph from the apartment use case, so it does not yet list community network stakeholders of its own. The site hosts, city roles, backhaul providers, and funders below are derived, supported by archive projects. The appendix outline shows the full version includes a roles table (AH3), a stakeholder table (AH4), and an operations table assigning each function (AH14).

Easily missed: site hosts, whose buildings, rooftops, and power make the network possible; owners of poles and streetlights; and a privacy and security lead, because a free public network collects connection data that users need to trust.

Archive projects with this cast

  • The Digital Education Connection Canopy links Phoenix College with Phoenix Union High School District, Alhambra and Cartwright elementary districts, and other districts, reporting reach of more than 250,000 families across 13 districts. DD-03753
  • Community Homework Wi-Fi Mapping projects involve local governments, schools, libraries, businesses, and students in Fairfax County, Kent, Clute, and Perris. DD-04101
  • New Mexico's Community Wi-Fi Digital Connectivity Technology Project, launched June 2026, funds public Wi-Fi through local governments and state agencies with nearly $6 million. DD-06012

Who keeps it going

A named network operator, a maintenance and help-desk assignment, site-host agreements that outlast individual staff, and a recurring budget line. The appendix outline's operations and maintenance model and review cycles (AH14, AH15) exist for exactly this.

Chapter 8 · Use case

A school hotspot lending program

Appendix AI

One of the most common responses to the homework gap, and one of the easiest to underestimate.

The dissertation names the stakeholders: students, parents and guardians, teachers, school administrators, district technology staff, librarians, counselors, wireless carriers, funders, school boards, and community partners such as libraries and nonprofit digital inclusion organizations. It explains each role. Teachers matter because they assign work that assumes internet access. Technology staff manage configuration, filtering, inventory, and support. Parents and guardians decide the terms of home adoption. Students gain or lose the most but often have little say, so the model asks planners to include them through surveys, focus groups, help-desk feedback, and multilingual outreach.

Among amplifiers it lists laptops, after-hours help, family digital skills orientations, school bus Wi-Fi, library access, and student digital ambassador programs, each bringing its own people.

Easily missed: counselors, who can identify students discreetly and reduce stigma; transportation staff, if buses carry Wi-Fi; and student ambassadors, who help peers and families set up devices.

Archive projects with this cast

  • Harris County Public Library's ECF Hotspot Lending Program involves the library, the FCC's Emergency Connectivity Fund, and patrons. DD-04141
  • The Coachella Valley School Bus Wi-Fi Initiative lists Coachella Valley schools, students, and transportation staff. DD-04098

Who keeps it going

The school board and funders who pay recurring data costs, technology staff who manage inventory and replacement, and the data team that compares outputs with outcomes each term. The dissertation stresses that devices age, coverage changes, students move, and funding disappears, so the program must be regularly reassessed.

Chapter 9 · Use case

A competitive urban fiber overbuild

Appendix AJ

A new fiber network built into city neighborhoods already served by other providers, paired with modernization of multifamily housing.

This use case appears in the dissertation's appendices (Case Study 5 in Appendix AE and the full Appendix AJ) but not in the Chapter 4 narrative. The appendix outline shows it covers target market and service-area segmentation, governance and stakeholder responsibilities, market, needs, and readiness assessment, and deployment and competitive strategy options, with roles and stakeholder tables (AJ3 and AJ4). Every stakeholder below is therefore derived by applying the model, supported by archive projects.

A competitive build adds stakeholders that the other use cases lack. Incumbent providers respond to the new entrant. The city controls rights-of-way and permits. Investors expect returns, which shapes where the network goes first. The equity question is whether low-income blocks and older buildings are served early, late, or never.

Easily missed: the people who decide build order, since that is where equity is won or lost; utility pole owners; and local workforce programs, which can tie construction jobs to the neighborhoods being built.

Archive projects with this cast

  • Baltimore's fiber-focused infrastructure expansion involves the City of Baltimore, internet providers, and public-housing partners, using municipal fiber, leased access, and public-private partnerships. DD-03796
  • People's Choice Communications shows an alternative ownership model, with worker-owners and subscriber-members governing a mesh and fiber network offering 200/200 Mbps for $30 a month. DD-04535
  • The Log-In Georgia Project pairs the Government of Georgia, Open Net, and the World Bank with local providers on open-access fiber. DD-00403

Who keeps it going

The provider's operations team, the city's franchise or rights-of-way office, building owners who maintain in-building access, and a community partner who monitors whether affordable tiers are offered and used in the neighborhoods that need them.

Chapter 10 · Use case

An AI literacy and digital skills initiative

Appendix AK

Building the knowledge and confidence to use AI tools safely, so that a new technology does not open a new divide.

Appendix AE's Case Study 6 is titled "Artificial Intelligence, Digital Skills, and the Emerging AI Divide," and Appendix AK, "AI Literacy and Digital Skills Initiative," gives the full use case, including stakeholder tables. The body text of those appendices was not in the file, so the stakeholders below are derived. They follow the dissertation's own discussion of AI: tools could help with tutoring, translation, accessibility, and advising, but the divide could widen if access requires paid subscriptions, advanced devices, reliable broadband, or data literacy, and bias, opacity, and privacy risks create new disparities.

That makes this cast different. Designers, privacy and ethics reviewers, and accessibility specialists move to the center, alongside the teachers, librarians, and colleges who deliver the learning.

"We can't offer AI solutions to someone who doesn't know how to use the internet in the first place."Interview participant QM

Easily missed: the designers of the tools themselves, whom participant QG said should learn what it is like for someone who cannot understand them; people with disabilities and neurodiverse users as co-designers; and families, whose own AI literacy shapes how students use the tools at home.

Archive projects with this cast

  • Sacramento State's Connecting Minority Communities partnership trains student digital navigators and offers free neighborhood classes including AI literacy, with Sacramento City College, Valley Vision, United Way, the California Emerging Technology Fund, Asian Resources Inc., La Familia, Mutual Housing California, and Boys & Girls Clubs. DD-04300
  • Korea's AI Digital Learning Centers expanded to 69 sites in May 2026, run with MSIT, NIA, and local operators. DD-02594
  • Andorra's Ministry of Education is integrating AI literacy into the basic curriculum. DD-01302
  • The UK's National Catalogue of Digital Personas brings together BCS, LOTI, Lloyds Bank, the University of Cambridge, older adults, disabled and neurodiverse experts, and designers and developers. DD-04487

Who keeps it going

Curriculum owners who update content as tools change, a data-governance lead who reviews new tools before adoption, community learning centers that keep teaching adults, and evaluators who track confidence and safe, independent use rather than course attendance.

Chapter 11

Build your stakeholder map

Choose the barriers your diagnosis found and the solution you are considering. The tool builds a starting roster, grouped by family, with the reason each stakeholder belongs.

Treat the result as the first step of Phase 2, not the last. Then name real people for each role, weigh their power and stake, and check the map with the people on it.

Barriers found in the diagnosis
Solution being considered
Setting

Closing

Seven principles for the people side of connection

  1. Map roles, not organizations. One person may hold several roles, and one organization may hold roles with different interests.
  2. Start from the barrier. Each barrier and each solution brings its own stakeholders; the usual four rarely cover them.
  3. Find the gatekeepers early. Owners of rooftops, poles, data, and budgets can end a project others support.
  4. Weight power honestly. Give the people with most at stake a formal voice in design, not only an announcement after it.
  5. Plan the cast change. Deciders give way to builders and builders to helpers. Hand-offs are where commitments are lost.
  6. Name who continues. Recurring costs, support, maintenance, training, and refresh each need an owner before launch.
  7. Keep checking the map. Staff leave, partners change, and new barriers appear. The dissertation's feedback loop applies to people as much as to technology.

Back matter

Sources and notes

Ross, P. (2026). Dissertation, committee draft dated September 23, 2026. Used: Chapter 4 interview findings on stakeholders, power weighting, and sustainability; the model's interpretation sections; the model simulations and use cases for the apartment, community wireless (figure note), hotspot, and rural cases; Chapter 5 practical implications. Outlines only: Appendix W (Stakeholders Identified), Appendix X (Education Specific Stakeholders), Appendix AC (Phase 2 steps), and Appendices AE through AK (use cases). Their body text was not present in the file provided.

Digital Divide Projects and Initiatives master file, updated September 24, 2026, digests 1 to 10 (6,295 records). The Chapter 1 chart classifies the "Lead / Involved Entities" field by keyword; figures are approximate.

A note for the committee draft: in Chapter 4, the "Stakeholder and System Context Analysis" subsection repeats the Phase 1 problem-framing text, and the community free wireless use case repeats the apartment use case's stakeholder and strategic-fit paragraphs. Both may be worth revisiting.

Archive records cited