The setting
The dissertation's multiple dwelling unit use case describes a 100-apartment building from the 1970s. Broadband is "available" on paper, yet residents experience slow, unreliable, expensive service. The building has old copper or coaxial pathways, no structured cabling, and materials that interfere with signal. One provider may control access, and the owner controls risers, rooftops, utility rooms, conduit, budgets, and construction schedules. Residents, the main beneficiaries, are the least formally powerful people in the decision.
The promising idea
Upgrade the building with fiber and a managed in-building network, and provide residents with service at no cost for the funded period. This is already a bundled idea: it pairs infrastructure with affordability, which is why it arrives at the gate in better shape than a wiring-only proposal.
What the archive shows
- California's CASF Broadband Public Housing Account approved up to $595,911 on August 13, 2026, for four affordable housing developments with 315 units, installing infrastructure of at least 100/20 Mbps with service to residents at no cost. DD-04866
- The Detroit Last Mile Initiative commits $3.5 million of a $4.5 million Rocket Community Fund gift, with DigitalC and the Detroit Housing Commission, to reach up to 2,400 households and about 6,000 residents, building on a 2025 pilot. DD-05149
- Maryland's Home Stretch for Public Housing Broadband Program funded last-mile and in-building construction in affordable housing through the ARPA Capital Projects Fund. DD-04151
The dissertation compares four design options for the building: fiber to every unit, fiber to the building with managed Wi-Fi, a neutral-host or open-access model shared by several providers, and a temporary wireless bridge during internal upgrades. It recommends ranking them on resident need, total cost of ownership, speed and reliability, accessibility, privacy, maintainability, and affordability, and it lists the adverse conditions to expect: aging electrical systems, asbestos or construction limits, lack of riser space, displacement fears, language barriers, privacy concerns, and distrust of management.
Running the gate
- StrongCausal fit. Barrier mapping found two causes, outdated building infrastructure and unaffordable service. The option answers both.
- StrongOpportunity fit. Residents rely on mobile-only access or public Wi-Fi for school, work, telehealth, and public services. The expected outcomes are concrete.
- PartialFeasibility fit. Right-of-entry is not yet signed, riser space is unconfirmed, and the no-cost service has an end date. What happens after the funded period is the year-two question.
- StrongTechnology fit. Options were compared against the building's conditions; the managed network is maintainable and measurable by unit.
- PartialSafeguard review. A managed building network raises privacy questions, and residents' distrust of management could suppress sign-ups. Multilingual onboarding and support are not yet designed.
Advance with conditions
Conditions of approval: a signed right-of-entry agreement before construction; a written plan for affordable service after the no-cost period; a privacy notice for the managed network; multilingual onboarding and a support path for devices, passwords, and installation.
Measure outcomes, not units passed. The dissertation is explicit that a building can be wired while the divide persists. Track subscriptions, reliability, and support tickets by unit type and language group.
What would change the decision
If the owner declines to sign access terms, feasibility turns weak and the option must be modified, perhaps toward a neutral-host model or a different building. If residents are not subscribing after launch, the dissertation points to price, distrust, missing devices, confusing sign-up, or weak outreach as the causes to investigate.